![]()
![]()
| Production Name | Pile driving boom arm |
| Material | Q355B/Q690D |
| Color | Yellow/Red/Orange/Customizable |
| Length(m) | 13.5-18m |
| Model | 30-50 Ton |
![]()
Piling Types
Steel Sheet Pile, Concrete Pile, Photovoltaic Pile, U‑Shaped Pile, Casing, Channel Steel Pile
Different sheet piles apply to various construction scenarios
1.Sheet piles and channel steel piles
Steel cofferdam for bridge construction, support for sewage pipelines, permanent river‑bank reinforcement, foundation caps for real‑estate projects, roadside landslide prevention, basement and sewer construction.
2.Casing
Used together with rotary drilling rigs to avoid hole collapse during drilling, widely applied in bridge building and real‑estate construction.
3.Concrete piles
River bank reinforcement and solar power project piling work.
![]()
![]()
![]()
1. The overall scope of work is quite large.
The upper arm and forearm can open to an angle of up to 160 degrees, and the angle between the upper arm and the base can reach 88 degrees.
2. Longer service life.
With the same material, the plates on our arms are thicker.
3. The use of 90‑degree connectors reduces the degree of hose bending during boom and arm operation, thus increasing service life.
4. The boom piping is segmented for easier maintenance and uses cold‑drawn tubing. The distribution between the boom and arm is more rational, and reinforcement has been applied to areas on the boom prone to cracking.
5. A reinforcing plate was added to the forearm bending area, and all these stress points were reinforced to reduce the possibility of arm breakage.
6. Centralized lubrication of pipelines facilitates maintenance and repair.
![]()
![]()
![]()
Pictures Display
![]()
![]()
![]()
![]()
Production Process
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()