16m 18m 24m Excavator Pile Driving Arm Pile Driver Attachment For Excavators for Piling Steel Sheet Pile Cement Pile
Quick Details:
Desciption:
The excavator pile arm pile boom is frequently used in piling steel pile and cement pile. The boom is straight which ensures pile higher. The excavator pile arm pile boom often carry a pile hammer in working. Because the pile arm need to lift the front part high, the requirement of excavator pile arm pile boom is high. We adopt professional design of the internal reinforcement ribs and strength the places which bear huge stress.
Specifications:
Excavator Model (ton) | Total Length (m) |
20-24T | 11-12m |
25-28 T | 12.5-13m |
30-38 T | 13.5m |
36-39 T | 15m |
40-47 T | 13-14.2m |
40-50T | 15-15.8m |
45-52T | 16.5-16.8m |
47-52T | 18-19m |
65-85T | 24m |
welcome to send your excavator model to us, we will recommend suitable length to you according to your excavator model.
Excavator Pile Arm's details:
* Comparing with the same length pile driving arm, ours can pile higher.
* Adopt 90 degree elbow joint to avoid hose bending and increase it service life
* Seamless precision steel pipe
* Centralized lubrication system
* The boom seat sleeve adopts all in one molding process
* Graphite alloy copper sleeve
* Hydraulic pipelines section design, convenient for later maintenance
* Multi-layer reinforcing rib plate at the stress place, more firm, integrated molding
* Reinforced upper and lower cover plates prolongs service life.
Producing Details:
* We are arm with a professional and experienced team, 24h available for answering your questions.
* The production machine we have is the most precision.