![]()
![]()
![]()
Advantages of excavator pile driving boom arm / Pile Machines
The angle between boom and horizon can reach 88°,The angle between boom and arm can reach 160°
1. Comparing with the same length pile driving arm, ours can pile higher.
2. Adopt 90 degree elbow joint to avoid hose bending and increase it service life
3. The box has built-in transverse and vertical reinforcement ribs to improve pile driving boom tensile strength
4. Seamless precision steel pipe
5. Centralized lubrication system
6. three layers with four passes welding
7. The boom seat sleeve adopts all in one molding process
8. Graphite alloy copper sleeve
9. Hydraulic pipelines section design, convenient for later maintenance
10. Multi-layer reinforcing rib plate at the stress place, more firm, integrated molding
11. The back bushing of the pile arm is wrapped by the whole board to avoid falling off
![]()
![]()
![]()
Some pictures of pile driving boom arm![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
![]()
Quality Control
Post-welding Testing
Accuracy Testing
Weld bead testing
Testing before send out goods
Operation Testing
The first system is the technical design drawing review mechanism
The second system is the semi-finished product review mechanism,(each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether theinstallation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure that is qualified before shipping.![]()
![]()
![]()
![]()
![]()