logo

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine

1 piece
MOQ
$9950/pieces
Price
16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine
Features Gallery Product Description Request A Quote
Features
Specifications
Application: Excavator
Brand Name: Zhonghe
Part Name: Boom/Arm/Bucket Cylinder
Material: Q355D/Q690D
Color: As Customer Requires
Warranty: 6 Months
Condition: 100%new
Quality: High-Quality
MOQ: 1 PCS
Packing: Standard Packing
After-sales Service Provided: Online Video Support
Basic Infomation
Place of Origin: Guangdong, China
Brand Name: Zhonghe
Certification: CE
Payment & Shipping Terms
Packaging Details: Bubble bag packaging
Delivery Time: 20-30 work day
Payment Terms: T/T
Supply Ability: 5 Piece/Pieces per Month
Product Description

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 0

16-20 Meters Three-Section Demolition Long Boom for Excavators

ZX250 ZX260 ZX330 for Construction Machine16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 116-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2

  •   A high reach demolition boom adds a middle arm to the two-section demolition boom, increasing the working safety distance. It typically equipped with a breaker hammer or a hydraulic shear for high building demolition projects.
  •   High reach deomolition armwill boring after welding , the accuracy is high precision as the original arm to prolong it service life.

 

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 3

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 416-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 5

Specification

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 6

 

Standard Configuration
 1. Boom, arm and middle arm
 2. Linkage assembly*1 kit
 3. Bucket cylinder (22 ton type)*1
 4. High pressure hoses*18
 5. Pins*8
 6. Stop valves*10
 7. Lubrication hoses*5
 8. Counterweight optional

 

 

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 716-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 816-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 916-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1016-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1116-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1216-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1316-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1416-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1516-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 16

ZHONGHE triple quality control system
The first system is the technical design drawing review mechanism,
The second system is the semi-finished product review mechanism,
(each process has a detection testing for the previous process)
The third system is the finished product testing.
(Before painting, the overall inspection is carried out to check whether the design size matches the welding size, and whether
the installation size meets the design requirement.)
To sum up, every single ZHONGHE product has been passed the above three-stage inspection system to ensure
that is qualified before shipping.

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1716-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1816-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 1916-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2016-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2116-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2216-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 23

Bubble bag packaging for most products, Wooden case for little products, like buckets

Iron frame support for boom arms.
The accessaries and package of excavator long boom arm are subjected to our final confirmation.

16-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2416-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2516-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2616-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 2716-20 Meters Three-Section Demolition Long Boom for Excavators ZX250 ZX260 ZX330 for Construction Machine 28

 

 

Recommended Products
Get in touch with us
Contact Person : Mr. iris
Tel : 8615362217237
Fax : 86-138-2232-5403
Characters Remaining(20/3000)